Archivo
Coinciden con estos filtros: 7 piezas
Piezas
- ComentarioIndustrial Policy
A state incentive buys a location decision, not national capacity
Plant construction spending rose from an annual rate of 75 billion dollars in 2020 to 244 billion in 2024; manufacturing output ended 2025 4.3 index points above 2020, and employment three hundred thousand below its 2023 peak. Plant takes years to run, so those readings are not yet a verdict.
- ComentarioDevelopment Finance
A development institution should give up the senior position and hold the first loss
The United States ran a current account deficit in every year from 2020 to 2025, averaging 147 billion dollars a quarter at the start of that window and 294 at the end, exactly twice as wide. An institution that gives up the senior position will report a smaller book and a worse loss record, and both are the point.
- ComentarioDevelopment Finance
Mobilised volume is the wrong test of a development finance institution
Mobilised volume counts the private dollars that closed alongside a public commitment, and it can be audited on the day the deal signs. Additionality asks whether those dollars would have moved anyway, which nobody can observe, and an institution that adopts the harder standard will report a smaller number for more difficult work.
- ComentarioDevelopment Finance
Adaptation keeps losing to mitigation because an avoided loss is not a cash flow
The ten-year Treasury averaged 0.89 percent in 2020 and 4.29 percent in 2025, and at those rates a dollar of avoided damage arriving in thirty years is worth 76.7 cents and 28.4 cents. Turning that dollar into a cash flow needs a named obligor, and the party that funds a defence is rarely the party whose balance sheet it repairs.
- ComentarioInfrastructure
The ten-year Treasury has done more to infrastructure than any permit reform
In 2020 a thirty-year asset was discounted against a long rate of 0.89 percent. In 2025 the same asset is discounted against 4.29. No procedural reform on the table is worth as much as that one line, and almost nobody appraising a project talks about it.
- ComentarioInfrastructure
Local infrastructure is limited by the people who can run a project, not by the price of money
The ten-year Treasury rose from 0.89 percent in 2020 to 4.29 in 2025 and nonresidential construction spending rose alongside it, from 856 billion dollars a year to 1,309. What complicates the argument is that the only capacity measure held here counts business and financial operations workers across every industry, not the staff of any city hall.
- ComentarioMultilateral Institutions
Sovereign restructuring was built for a world where delay cost the creditor nothing
Reprofiling worked because a payment pushed out ten years cost the creditor nothing in real terms, and in 2020 the implied real ten-year yield was minus 0.60 percent. In 2025 it was plus 1.96 percent, so the same extension now costs a real 17.6 percent, and a process whose only enforcement is peer pressure has to arrange that loss.