  • KommentarEnvironmental Permitting

    Whether permitting is slow can only be answered by counting the applications still waiting

    Housing units authorised by permit fell from an annual rate of 1734 thousand units in 2021 to 1431 in 2025, a drop of 303. That series counts decisions leaving the permitting system and never the applications sitting inside it, and a count of departures is consistent with any waiting time at all.

  • KommentarEnergy & Power

    Interconnection queues are a pricing failure, and faster studies will not clear them

    The charge a project faces for connecting to the grid cannot be known when the decision to build is made, because it depends on which other applications are studied first, and a charge settled that way is a draw rather than a price. No series in this brief measures a queue, so the case rests on mechanism and on what the priced parts of the system already show.